Turnkey DC Fast Charging Deployment

From initial site feasibility to final utility interconnection. We manage the entire infrastructure lifecycle so you can focus on your business.

We Don't Just Sell Chargers. We Build Infrastructure.

Deploying DC Fast Charging infrastructure is a complex construction project involving high-voltage utility upgrades, municipal zoning, and strict compliance standards. Most providers hand you a charger and a manual.

We act as your developer, engineer, and general contractor. We navigate the bureaucratic maze of utility companies and city planners to get your site energized faster and on budget.

  • One Partner: Eliminate the finger-pointing between architects, electricians, and hardware vendors.

  • Utility Experts: We have deep experience navigating complex interconnection queues (PG&E, SCE, NV Energy, and more).

  • Capital Efficient: We value-engineer every site to minimize trenching costs and avoid unnecessary switchgear upgrades.

Make it

Our “Permit-to-Power” Method

01. Feasibility & Power Analysis Before we break ground, we break down the data. We analyze your site’s available electrical capacity, grid proximity, and ADA accessibility to determine viability instantly.

  • Deliverable: Detailed Site Feasibility Report & ROI Projection.

02. Engineering & Utility Coordination This is where projects usually stall. We proactively manage the "New Service Request" with the utility provider, handling load calculations, transformer upgrades, and easement negotiations. Our in-house engineers design site plans that maximize charger density while minimizing conduit runs.

03. Permitting & Compliance We handle all municipal entitlements, zoning variances, and building permits. Crucially, we ensure all hardware and layouts meet California CTEP (Weights & Measures) and NEVI standards.

04. Construction & Deployment Our certified electrical and civil teams manage the physical build. From trenching and pouring concrete pads to setting switchgear and installing high-power dispensers, we execute with precision.

05. Commissioning & Handoff Installation isn't the end. We perform rigorous load testing, network integration (OCPP), and payment gateway validation. We don't leave the site until the chargers are live, communicating with the cloud, and processing real transactions.

06. Ongoing Support Commissioning is just the beginning. EV Range safeguards your asset’s long-term value through our 24/7 Network Operations Center (NOC). From remote self-healing diagnostics and predictive maintenance to round-the-clock driver assistance, we deliver a truly vertically integrated solution that guarantees uptime and maximizes revenue.

Make it

FAQ

Q: How long does it take to install a DC Fast Charging station? A: A typical DCFC project takes 6–12 months. While construction only takes 4–8 weeks, the majority of the timeline is consumed by utility interconnection (waiting for power) and municipal permitting. EV Range accelerates this by running these processes in parallel.

Q: Do I need a utility upgrade for DC Fast Charging? A: Likely, yes. DC chargers draw significant power (480V, 3-phase). EV Range conducts an initial load study to determine if your existing transformer can handle the load or if a new utility service is required.

Q: What is the difference between "Turnkey" and just buying chargers? A: Buying a charger means you are responsible for hiring an electrician, getting permits, and talking to the power company. "Turnkey" means EV Range handles all of that for a fixed price, handing you a fully operational site at the end.